Originally Posted by
redcagepatrol
I like this idea...
"In addition, Moser Engineering, Inc. will replace their 33, 35, & 40 spline axles for a period of ten (10) years after the original date of purchase if broken at the splined end due to excessive horsepower. However, 33 spline axles that were broken due to excessive horsepower will be replaced at the sole option of Moser Engineering, Inc., with 35 spline axles. In the event that 35 spline axles are broken due to excessive horsepower within ten (10) years of purchase, they will be replaced at the sole option of Moser Engineering, Inc., with 40 spline axles. If 40 spline axles are broken due to excessive horsepower, they will be replaced at the sole option of Moser Engineering, Inc with another set of 40 spline axles, free of charge."