Originally Posted by
CheapJeep
List of stuff completed so far. Decided to knock out the fab work and least favorite tasks first.
-moved the front axle forward 1.5". Built custom 3/8" spring pad plates with 5/8" shank locating pins in addition to welding them in.
-built a new steering box brace.
-replaced front output seal on stak
-tore down the d60 to replace seals and bearings (waiting on parts to finish)
-installed new diff covers front and rear
-50 sets of curls
Still to do
-FAST fuel injection
-PSC pump, reservoir, and cooler
-new hood
-more curls
Might be adding a couple more things before the trip if I can decide...