Oh and the first top went on the Tate Jeep no problem. It helps when it isn't in the 30s outside
Printable View
Oh and the first top went on the Tate Jeep no problem. It helps when it isn't in the 30s outside
Check all the oils, check the u-joints, and load the cooler. Taking the scout, jeep still needs work.
Traction bars, rear drivershaft, lots of lights, and cupholders
Lurch:
-Rewire Control switches for fans, lights, OBA
-Replace headlight switch
-Replace entire cooling system (done)
-Remove "rebuilt" radiator that is apparently bad and install new radiator
-Wait for new radiator
-replace power steering pressure hose and return
-get shorter belts for new alternator pulley
-Disassemble front axle and repack wheel bearings
-change gear oil in front axle
-grease all ujoints
-change engine oil and filter
-install new stereo head unit
-install different windshield frame and windshield
Trailer:
- Weld deck plate that has broken loose
- Get tire with nail in it patched
- Repack bearings and inspect suspension
- Replace clearance lights on rear
Tahoe
- Reinstall transmission, exhaust, etc associated with pulling out the trans.
-waiting on trans to be finished being built
-waiting on torque converter to be built and shipped in
- change engine oil
- rotate tires
I'm sure there is some stuff I'm forgetting...
-Distill 30gal of mash
-pack
Jeep:
Figure out what is wrong if anything with transmission
exhaust leak
put top on
Durango alternator
install PS pump skid thing
Clean insides of all Shiloh mud
Inspection sticker is out.
Trailer:
Think its good
Jeep
-finish welding stuff
-put front axle back together
-top off fluids
-change oil
-build skid plate for the motor/trans/transfer cases
-doors and a windshield would be nice but I don't know if I will get there.
Trailer
-figure out why the brakes aren't working/ replace coils
Truck
-Change oil
-Rotate tires
- finish wiring buggy from scratch
- test wiring, fix anything that doesn't work
- install steering column
- install dash
- final align axles to chassis, make sure it's all square
- cut down extra length of bolts at link connections
- put in heat shield on backside of interior panels
- install driveshafts
- install panels, seats, center console, seatbelts, etc... Finish assembly
- put in brake fluid, bleed brakes
- put in gear oil
- N2 in shocks
- test drive, pray that everything works
- put water in front tires
- load on trailer
- pray that Dodge and trailer and Lynda's Jeep are good to go...