**** To Do List:
- Mount Radiator (either build better mount for existing radiator, or install newish aluminum radiator and get new fan. leaning towards just building a good mount for the existing one)
- Replace bolts for front of bed.
- Mount rock ring outter on H1's up front.
- Install tunes.
- Flush diffs, install new diff covers, fill with fluid and repair breather tubes.
- Finish up cutting brakes.
- Install rock lights.
- Get exhaust redone.
- Replace front windshield (not a necessity at this time, but it is getting pretty close to being pretty fubar'ed).
- Groove boggers.
- Install 2nd propane tank mount and cut sight hole in side of bed.
- Clearance rear fenders.
- Build tube tailgate and skin with original tailgate.
If I make it into TTC, it will need waterproofing (snorkel and distributor) plus a 15/16.5k lb winch (which will need to be hard mounted instead of on the cradle like the 9.5ti I have now)
Who's got my brake line flare tool?
**** To Do List (updated AGAIN!) :
- New Master Cylinder for brakes and plumb in 2nd line lock(or at least get them bled long enough to install hydroboost)
- Install new clutch slave and bleed
- Install new fan belt
- Reseal diff covers
- Replace bolts for front of bed. (.5 hour)
- Groove boggers.
- Clearance rear fenders.
- Mount front tires on recentered rims.