**** To Do List:

  • Mount Radiator (either build better mount for existing radiator, or install newish aluminum radiator and get new fan. leaning towards just building a good mount for the existing one)
  • Replace bolts for front of bed.
  • Mount rock ring outter on H1's up front.
  • Install tunes.
  • Flush diffs, install new diff covers, fill with fluid and repair breather tubes.
  • Finish up cutting brakes.
  • Install rock lights.
  • Get exhaust redone.
  • Replace front windshield (not a necessity at this time, but it is getting pretty close to being pretty fubar'ed).
  • Groove boggers.
  • Install 2nd propane tank mount and cut sight hole in side of bed.
  • Clearance rear fenders.
  • Build tube tailgate and skin with original tailgate.


If I make it into TTC, it will need waterproofing (snorkel and distributor) plus a 15/16.5k lb winch (which will need to be hard mounted instead of on the cradle like the 9.5ti I have now)