Results 1 to 15 of 1000

Thread: Beast from da Middle East

Threaded View

  1. #11
    Flyin' the Hindenburg 2.0 DRAGOONRANCH's Avatar
    Join Date
    Jan 2006
    Location
    DAAAnngerrr Zone!
    Posts
    15,003
    Quote Originally Posted by DRAGOONRANCH View Post
    **** To Do List:
    • Mount Radiator (either build better mount for existing radiator, or install newish aluminum radiator and get new fan. leaning towards just building a good mount for the existing one) (1-2 hours)
    • Replace bolts for front of bed. (.5 hour)
    • Mount rock ring outter on H1's up front. (.5 hour)
    • Flush diffs, install new diff covers, fill with fluid and repair breather tubes. (ruffstuff covers :check: )(1 hour)
    • Finish up cutting brakes. (1 hour)
    • Install rock lights, turn/brake/running lights. (jcwhitney for turn signal :check: )(3 hours)
    • Get exhaust redone. (1 hour)
    • Groove boggers. (will probably do up there)
    • Install 2nd propane tank mount and cut sight hole in side of bed. (.5 hour)
    • Clearance rear fenders. (.5 hour)
    • Mount winch (1/2 day w/ radiator mounting)
    just cleaning up the list of **** to do.

    Parts:
    Turn signal switch
    Diff Cover Bolts
    Muffler pipe
    Winch hardware (clamps, clevis/hook, lug for end of wire rope)
    Last edited by DRAGOONRANCH; 05-13-2009 at 11:57 AM.
    Quote Originally Posted by Fredo View Post
    Ask your dad what it tastes like.
    Quote Originally Posted by Tyler View Post
    Tell Chris to get it up and I will do it.
    My bitch better have my money...
    Through rain, sleet, or snow...
    My whore better have my money...
    Not half, not some, but all my cash...
    'Cause if she don't,
    I'm gonna put my foot in her ass.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •